India’s nuclear programme achieved a major milestone as the Rajasthan Atomic Power Station’s seventh unit was connected to the northern grid. With the operation of 25 reactors and 13,100 MW capacity under construction, the indigenous 700 MW PHWR series plays a crucial role in reaching a goal of 100 GW by 2047.
Related Posts
UP minister Manohar Lal’s convoy attacked in Gwalior in road rage
Uttar Pradesh minister Manohar Lal ‘Mannu’ and his security detail were involved in a road rage incident in Gwalior. During the altercation, the minister’s Personal […]
‘You have to grab’: Rohit Sharma’s tips for fans ahead of Adelaide Test
Indian captain Rohit Sharma, having rejoined the team, engaged with fans in Adelaide before the crucial second Test. A video captured him posing for photos […]
Syrian govt loses control of second-largest city Aleppo for first time since 2011
Government forces lost control of Aleppo to the Islamist-dominated rebel alliance for the first time since the conflict began in 2011. The lightning assault was […]