Delhi airport operator DIAL on Wednesday said Terminal 2 (T2) is expected to be shutdown for four to five months starting from April and one of the runways will also be closed for upgradation during this period.
Related Posts
Shakira Thanks Fans For Their Support After Cancelling Peru Concert Due To Hospitalisation | N18G
- Bharat Tezz
- February 17, 2025
- 0
Shakira took to Instagram to thank her fans for their supportive messages following her hospitalization in Peru. The singer, who had to cancel her concert […]
Ibrahim Ali Khan Meets Papa Saif And Sara At Lilavati Hospital | N18S
- Bharat Tezz
- January 20, 2025
- 0
Ibrahim Ali Khan Meets Papa Saif And Sara At Lilavati Hospital n18oc_shorts News18 Mobile App – https://onelink.to/desc-youtube
Apna Bidu Jackie Shroff Has A Fun Banter With Paps As He Walks Red Carpet In Style | N18S
- Bharat Tezz
- January 18, 2025
- 0
Apna Bidu Jackie Shroff Has A Fun Banter With Paps As He Walks Red Carpet With His Best Friend And EverGREEN Companion n18oc_shorts News18 Mobile […]